Finite Scheduling
Sequence production forward or backward from due dates while respecting capacity, setup time, shift calendars, and multi-operation dependencies in one browser-based planning workspace.
Planify by OnePlanify helps manufacturers replace spreadsheet scheduling with browser-based finite planning that reflects real shop floor constraints. Model setups, shifts, routing dependencies, ERP work orders, and rush-order disruption in one practical workspace, so planners can publish schedules the floor can actually run without a long IT project.

Planify combines finite scheduling, ERP connectivity, routing logic, and disruption replanning for complex manufacturing floors.
Sequence production forward or backward from due dates while respecting capacity, setup time, shift calendars, and multi-operation dependencies in one browser-based planning workspace.
Model machine breakdowns, rush orders, and schedule disruptions before committing changes, then replan the entire board in seconds while preserving constraints.
Place work only inside real shift calendars, including first, second, and third shifts, overtime rules, holidays, closures, and workforce availability constraints.
Model sequence-dependent setup times and group compatible jobs so machines spend more time producing and less time waiting on tooling or changeover.
Enforce operation sequences and parent-child work order dependencies so downstream work never starts before upstream routing steps are complete.
Pull work orders, routings, and work-center data from your ERP, then dispatch sequenced operations without replacing the system you already use.
Planify gives manufacturers a constraint-aware scheduling layer that is easier to use than traditional APS and more realistic than spreadsheets. It models setups, shifts, routings, dependencies, and disruptions in a browser-based workspace, helping planners move from guesswork to executable production plans without a rip-and-replace ERP project.

Planify makes powerful production planning practical for complex manufacturing teams.
Comprehensive finite scheduling feels familiar, helping planners move beyond spreadsheets faster.
Models setups, shifts, dependencies, and disruption for real manufacturing floor conditions.
Runs in the browser with no on-prem installation or separate IT project.
Connects ERP work orders, routings, and work centers during guided onboarding.
Meet the team behind practical finite scheduling.
OnePlanify built Planify for manufacturers that need comprehensive finite scheduling without the burden of traditional APS complexity. The product is designed around the messy reality of shop floor operations: setups that change by sequence, shifts that do not run 24/7, routings with hard dependencies, and disruptions that force planners to rework the board fast. Instead of asking teams to manage another multi-month IT project, Planify delivers browser-based scheduling with small-batch onboarding and ERP connectivity support. Its vision is simple: make advanced production planning feel as approachable as a spreadsheet while producing schedules that match what the floor can actually run.
Production planning and control software helps manufacturers turn work orders, routings, work centers, shifts, and constraints into an executable production schedule. Planify focuses on finite scheduling, meaning it respects real capacity instead of assuming every machine and crew is available 24/7. The result is a schedule planners can publish and foremen can trust.
Talk with Planify about your floor, ERP, and scheduling challenges.
Comprehensive finite scheduling built for shop floors
Browser-based software with no on-prem installation
ERP work order connectivity during onboarding
Request a scoping meeting to see Planify run on your work orders, routings, work centers, and shift calendars.
To help us assist you faster, please include the reason for your message so the relevant team can reach out as soon as possible.
To help us assist you faster, please include the reason for your message so the relevant team can reach out as soon as possible.